​Recent Projects

01

Project: BREA PLACE

Owner: AVALON BAY
Contract amount: $3.2 Million
Completion: 2021

 

TTS was contracted As the General engineering contractor for the first phase of imp[improvements for a new 330 unit apartment complex in Brea for Avalon bay. The project consisted of install 900 L/F of 60" RCP 17 ft on state college street and abandon the exisitng pipe and structures, the project also Consisted of install center islands on state college and a new turn lane and bus turn out sound bound state college and birch. The work had to be completed prior to construction of the apartment complex new project due to the existing storm drain easements. TTS completed the work within the time frame for the client and was awarded the onsite portion for the two apartment complexes that curently under construction and scheduled to be completed in 2020

02

Project: IKEA BURBANK

Owner: Irvine Company
Contractor: VCC Construction
Contracted amount: 4.2 million
Completed 2017


TTS was subcontracted for the site wet utilities and site concrete for the project. The project at the time was the biggest Ikea in the nation over 440,000 sq ft. of retail space. The project was being built on an old contaminated super fund site. The site was overseen by multiple agency's to make sure compliance was being adhered too within the conditional use permit. One challenge for TTS was making sure we could provide the manpower  required due to the safety protocol required for the site. All personal had to be hazwoper trained so  logistically it was a challenge for TTS to keep the same crews together while providing efficiency and productivity to make the project a success. TTS installed over 15,000 L/F of under ground piping and 1200 yards of concrete on the site without any fines or delays that resulted in a successful project for us and the client

Project: 
Contractor: 
Contracted amount: 
Completed: 


I NEED A PROJECT

03

04

Project: SYCAMORE CANYON
Contractor: Reylenn Construction
Contracted amount: $1.6 Million
Completed: Jan 2019


TTS Engineering was contracted for the Wet and dry utilities for the 14 acre development. TTS Engineering was asked to finish the wet utility scope of work and took on the scope of work to finish the project within the time constraints by the owners. TTS biggest challenge was keeping accurate 

Copyright 2019 © TTS ENGINEERING INC.

20150901_105808_resized